Estimated: Ellendale, Dickey County, North Dakota; retained approximate town/project-area point, not a verified 180 MW building footprintApplied Digital
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed ribbon-cutting date reported June 23, 2023; not a claim all180 MW first energized that day.Applied Digital’s June 23, 2023 release dates the ribbon cutting for its 180 MW Ellendale hosting facility to June 16. This is the existing blockchain-hosting site, separate from the adjacent Polaris Forge 1 AI campus and its 400 MW contracted IT buildout.
1.00