第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
CBC[2] News reported that ExxonMobil Canada confirmed the Hebron topsides and gravity base structure were joined at Bull Arm on Dec. 13-14, 2016.
CBC News reported ExxonMobil Canada said work to join the topsides and gravity base structure at Bull Arm was completed Dec. 13-14, 2016.
RINA's press release describes Fagioli's heavy-lift installation of the Hebron topsides' Utilities Process Module and Living Quarters, completed in late 2016 ahead of the topsides-GBS mating shown in the video.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。