ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2028-12 is the requested commercial-operation month in NYISO[1][3]. Day 01 is only a month-precision anchor, not an announced commissioning day.
C24-283 is a 349 MW battery storage interconnection request in Richmond, NY. The grid operator lists its queue status as Active interconnection request. The requested in-service date is 2028-12-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins61% CONFIDENCEOverall confidence: 61%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 2028 is the tracker (EIA-based) expected online date; the county tabled AES's 2024 revival plan.[1]
Glen Canyon Solar A is a planned 95 MW solar farm near Big Water in Kane County, Utah, developed by AES. The project has been delayed by grid constraints, and trackers show a December 2028 online date.
Mill Point Clean Solar Energy Center, State Highway 30A & Glen 345 kV Transmission Corridor, Fultonville, Montgomery County, NY 12072ConnectGen (Repsol Renewables)
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ORES Section 94-c siting application filings and NYISO interconnection queue schedules place the 250 MW Mill Point Solar[1] project in December 2028 commercial operation.
ConnectGen (Repsol Renewables) development of the Mill Point Clean Solar Energy Center in the Town of Glen, Montgomery County, New York. Generating 250 MWac of utility-scale photovoltaic power along the Marcy–New Scotland 345 kV Mohawk Valley transmission corridor, the project supplies clean energy into NYISO Zone F.
Abercrombie Township, Richland County, North DakotaOtter Tail Power
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Otter Tail and the ND PSC order state full operation by end of 2028; the exact month is not published.[1]
Otter Tail Power's Abercrombie Solar is a 295 MWac solar facility in Abercrombie Township, northwest of Wahpeton, permitted by the North Dakota PSC as the Flickertail Solar Project. Full commercial operation is anticipated by the end of 2028.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the PJM queue proposed in-service of December 31, 2028 per interconnection.fyi[1].
Poseidon Storage is an 80 MW battery project in the PJM queue (AH1-249) in Fayette County, Pennsylvania, with Poseidon Energy, LLC as interconnecting entity. It entered the queue in September 2021 with a proposed in-service of December 31, 2028.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA Form 860M (via Interconnection.fyi[1]) gives a proposed completion of December 2028; no firm schedule or construction notice found.
Black Walnut Solar, LLC is a planned hybrid plant in Jones County, North Carolina listed with 80 MWac of solar and a 32 MW battery, 112 MW in all, operated by Cypress Creek Renewables. EIA Form 860M data show a proposed completion of December 2028.
South Heart Clean Energy Storage Facility, Interstate 94 & 230 kV South Heart Substation Corridor, South Heart, Stark County, ND 58655NextEra Energy Resources
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
South Heart Clean Energy Storage Facility remains an unconfirmed project identity. Its previously reported developer, capacity, investment, construction stage and operating schedule are not substantiated by the cited project material.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins53% CONFIDENCEOverall confidence: 53%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Commercial operation targeted for December 2028 pursuant to Colorado[1][2] Public Utilities Commission (CPUC) Clean Energy Plan filings and Xcel Energy interconnect schedules.
The Limon Solar Generating Station is a 150 MWac utility-scale photovoltaic generation facility situated across eastern plains rangeland in Lincoln County, Colorado. Connecting into Xcel Energy’s high-voltage 230 kV regional transmission network, the project delivers clean, cost-competitive solar electricity to the Front Range, advancing Colorado’s Clean Energy Plan and statutory decarbonization mandates.
Estimated: Rowan Percheron Data Center Campus Building 2, Tower Road & East Columbia Avenue Corridor, Boardman, Morrow County, OR 97818Rowan Digital Infrastructure
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
IREN plans a data center complex called Project Emerald on about 2,000 acres south of Kiowa in Pittsburg County, Oklahoma. A county review committee voted on the economic development plan on April 21, 2026, and IREN wants to begin building in 2027 in two phases.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Tract's Virginia Highlands development in Storey County, Nevada is planned to support up to 2,500 MW of data center capacity across 8,590 acres. It remains in the planning and infrastructure stage with no build date announced.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Cleanview[2] (an aggregator of queue data) lists expected commercial operation December 2028; no firm developer-announced date was found.
Maple Solar, LLC told the Huntington County Council and Commissioners in December 2022 that it intends to invest about $45 million in a 35 MW solar farm on roughly 200 acres in Salamonie Township. Cleanview lists the planned project with an expected online date of December 2028.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ClinicalTrials.gov[1] lists 2028-12-11 as the estimated primary completion date; a sponsor's estimate, and trials of this size routinely slip.
Pfizer's phase 3 trial of C.Difficile Vaccine in clostridoides difficile associated disease reaches primary completion, the point at which the last participant's primary outcome is measured. The trial enrolled 32,500 participants. The purpose of the study is to learn about how effective, safe, and tolerable the Clostridioides difficile (C. difficile) vaccine is in decreasing the number of C. difficile infections (pCDI) in adults 65 years of age or older. The participants will receive either the C. difficile vaccine or placebo (saline). A placebo does not contain any active ingredients. The vaccines will be given as a shot into the upper arm muscle. This study looks at the number of diarrhea (loose stools) events related to a C. difficile infection, so the length of the study can change. If these events happen quickly, the study may finish sooner; if they happen slowly, it could take longer. Sometimes, the study might stop early if the vaccine clearly does not work. Participants will stay in the study until enough events have occurred to answer the main question.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 15, 2028 is the proposed completion date in PJM[1] queue entry AH1-672 (via interconnection.fyi[2]). It is a developer-submitted queue date; an earlier Cleanview[3] listing of December 2023 passed without the project operating. No permit or construction start found.
Farmview Solar is a proposed solar project in Sussex County, Delaware, that would connect to Delmarva Power and Light's Farmview 138 kV substation (PJM queue AH1-672). PJM's facilities study lists it at 75 MW, and the queue now shows 68 MW, active, with a proposed completion of December 15, 2028. No permit or construction start was found.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ClinicalTrials.gov[1] lists 2028-12-30 as the estimated primary completion date; a sponsor's estimate, and trials of this size routinely slip.
Pfizer's phase 3 trial of PG4 in pneumococcal disease reaches primary completion, the point at which the last participant's primary outcome is measured. The trial enrolled 2,400 participants. The purpose of this study is to learn about the safety of a new pneumococcal vaccine and how the new pneumococcal vaccine helps to fight against germs that can cause pneumonia (lung infections), meningitis (brain infections), and otitis media (ear infections) in infants when compared to the pneumococcal vaccine that is currently in use, 20vPnC (Prevnar 20®). This study will test if the new pneumococcal vaccine is as safe as the one that is currently in use. This new vaccine can possibly provide additional protection against germs that cause pneumococcal disease that are not included in the vaccines that are currently given to infants. Pneumococcal disease includes a variety of infections caused by a specific germ, Streptococcus pneumoniae. There are two groups in this study. All participants will be assigned to one of the two groups.
McLennan County, Texas; retained EIA 66894 rounded reporting point, exact 25INR0071 footprint unverifiedSunraycer Assets I LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 30, 2028 is the later ERCOT[1] projected COD; EIA[3] instead reports December 2027. Neither is a confirmed service date.
ERCOT lists Albatross BESS request 25INR0071 at 50.4 MW with December 30, 2028 projected COD. Sunraycer’s current Albatross page instead describes a broader 208 MWac development targeting 2028; a separate ERCOT BESS 2 request is 159.6 MW.
Near Bush Knob Cemetery, FM 923, Throckmorton County, Texas (Bush Knob 69 kV interconnection)Solvent Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins64% CONFIDENCEOverall confidence: 64%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT queue 25INR0558 lists a commercial operation date of 30 December 2028 (Cleanview[3]: December 2028); the developer has published no date, and the county's November 2024 rescission of the abatement makes the date uncertain.
Solvent Energy's Ayass BESS is a 51 MW (ERCOT: 51.28 MW) battery in Throckmorton County, Texas on ERCOT queue 25INR0558; the county approved a tax abatement agreement 5-0 on 8 July 2024 and voted 5-0 on 12 November 2024 to rescind it, and no cost has been published.
Freestone County, Texas; retained rounded EIA 67649 reporting point, exact project footprint unverifiedCypress Creek Renewables
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 30, 2028 is the later ERCOT[1] projected COD, versus EIA[2] July 2029; neither establishes actual service.
EIA plant 67649 identifies Cypress Creek Renewables’ proposed 300 MW Amerada solar generator in Freestone County, with approvals pending and July 2029 planned operation. Later ERCOT request 26INR0082 reports 301.57 MW and December 30, 2028 projected COD; construction is not established.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Given as scheduled, per the source[1]: "expected to be completed by 2028".
Quebec is replacing the perpetually troubled retractable roof of Montreal’s 1976 Olympic Stadium with a new fixed structure, targeting a 2028 reopening.
Warringah Freeway, Cammeray, Sydney, NSW, Australia
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Given as scheduled, per the source[1]: "Western Harbour Tunnel remaining on track to open to traffic in 2028".
Sydney's Western Harbour Tunnel, redesigned mid-build from a cut-and-cover crossing to twin bored tunnels, is on track to open beneath the harbour in 2028.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: a "by when" market with no scheduled event behind it. The largest step between consecutive strikes (taking the highest quote seen so far where a later strike is quoted lower) is Jan 1, 2029 (10%) to Jan 1, 2030 (24%), so the window opens on Jan 1, 2029. Quotes are bid/ask midpoints read on 27 October 2026. Estimated contract-count-times-last-price volume across active strikes is about US$1,102 (7,559 contracts); this is not reported cash turnover.[1]
Kalshi
On 27 October 2026 Kalshi put an official Airtable IPO confirmation at 4.5% before Jan 1, 2027, rising to 24% before Jan 1, 2030. The largest step in the ladder runs from Jan 1, 2029 to Jan 1, 2030 (10% to 24%), so that window is the market's most likely stretch; it is a bet on timing, not a listing date.
Reported Hodgeman/Ford, Kansas queue location only; POI/utility conflict unresolved, marker is not a verified solar site
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
January 15, 2029 is SPP’s[1] proposed COD, not verified commissioning; location/POI conflict remains unresolved.
SPP lists GEN-2017-184 as 400 MW solar, proposed COD January 15, 2029 and IA fully executed/on schedule. Its location fields say Hodgeman/Ford, Kansas, but POI is Nashua–St. Joe 345 kV and utility KCPL; geography needs correction by the source.
Bossier Parish Energy Storage Center, US Route 71 Corridor, Bossier City, Bossier Parish, LA 71112
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-01-15 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2024-177 is a 199 MW battery storage interconnection request in Bossier Parish, LA. The grid operator lists its queue status as DISIS STAGE. The requested in-service date is 2029-01-15; this is a planning date.
22243 Stottlemeyer Rd NE, Poulsbo, WA 98370BrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
BrightNight publishes no schedule; the 1 February 2029 operating date comes from EIA-860M (plant 68366, generator AGAT) as listed by Cleanview[3], and an earlier tracker listing said December 2027, so the date is only an estimate.
BrightNight is proposing the Agate Storage Project, a 150 MW / 600 MWh lithium-ion battery (about 170 MW in the county SEPA filing) next to Puget Sound Energy's Foss Corner Substation near Poulsbo, Washington; no cost or schedule is published and Kitsap County's battery moratorium runs to 7 December 2026.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins59% CONFIDENCEOverall confidence: 59%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA's[2] September 2026 preliminary generator inventory lists planned operation in February 2029 (survey estimate, approvals pending); a Cleanview[3] tracker lists January 2028. The date is the planned operation month, not a groundbreaking date.
BrightNight is partnering with the Confederated Tribes of Warm Springs and Warm Springs Power and Water Enterprises on the Salmonfly Project, a solar and battery storage facility on the Warm Springs Reservation in Jefferson County, Oregon. Warm Springs News describes up to 250 MW-ac of photovoltaic solar and up to 250 MW-ac of battery storage on up to 2,000 acres, tied to the tribally owned 230 kV bay at the Bethel Round Butte Substation; EIA lists 247 MW of each. No cost has been published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins56% CONFIDENCEOverall confidence: 56%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per en.wikipedia.org[1]: "…and construction in July 2023, with the expected completion and first light set for March 2029.[13][…"
A 39-metre segmented mirror in Chile's Atacama, collecting more light than all existing 8-10 metre telescopes combined. Estimated date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
NYISO’s current workbook lists Shallow Seam Energy Storage LLC’s C24-233 battery as 400 MW / 1,600 MWh, four hours, at the Homer City–Mainesburg 345 kV line in Clearfield, Pennsylvania. This corrects the PJM attribution and replaces end-2028 with March 2029 COD.