ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Unverified legacy June 2029 COD; official interconnection table is not a construction schedule.[1]
Illinois Commerce Commission’s February 2025 PJM table lists storage requests AH2-089/090/091 with 1200 MW maximum facility output, zero added energy MW and 50 MW capacity each. Those interconnection quantities do not verify a standalone 1200 MW/4800 MWh BESS or$900 M budget.
County Highway HH & North County Road X, Stevens Point, Portage County, WI 54481Doral Renewables LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Doral Renewables is developing the 440M USD, 399 MWac utility-scale solar generation facility across 3,000 acres in Stevens Point, Portage County, Wisconsin, interconnecting to ATC / MISO 345 kV lines.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Unverified legacy July 2029 estimate; facilities study describes 310 days after GIA execution and disclaims transmission-owner commitment.[1]
PJM’s AF2-027 facilities study specifies a 50 MW battery system at Zion, increasing the shared facility’s maximum output to 635 MW. The prior 1,206 MW “Aurora” battery identity and $850M budget are not substantiated.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the proposed completion in EIA Form 860M as shown by the Interconnection.fyi[1] aggregator; no firm schedule from developer or regulator was found.
Crossroads Solar is a planned 150 MW solar PV plant in Liberty County, Georgia, operated by Crossroads bn, LLC per EIA-860M data. Proposed completion is 2029-07.
Cloud Solar Energy Center, US Highway 81 Corridor, Concordia, Cloud County, KS 66901
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-07-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2024-067 is a 380 MW photovoltaic generation interconnection request in Cloud, KS. The grid operator lists its queue status as DISIS STAGE. The requested in-service date is 2029-07-01; this is a planning date.
Lyme and Brownville, Jefferson County, New YorkAES
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
July 1, 2029 is an EIA-based proposed completion; AES[1] gives no construction or online date.
AES's Riverside Solar is a 100 MW solar project in the Towns of Lyme and Brownville, Jefferson County, NY, which received an ORES siting permit on January 9, 2023. Aggregators list a proposed completion of July 2029; AES describes it as in development.
415 East Prairie Ronde Street, Dowagiac, Cass County, Michigan 49047, United StatesHyperscale Data
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
July 1, 2029 remains an unverified estimated buildout-year anchor. Issuer roadmap depends on a utility agreement and 44-month interval, not a fixed July completion date. Existing operations are separate from the proposed 340MW expansion.[1]
Hyperscale Data's Dowagiac, Michigan campus runs about 30 MW today and the company targets 340 MW by the third quarter of 2029; it bought 48.5 more acres in June 2026, faces a federal noise class action, and has published no project cost.
Steel River EIA plant 70398 reporting point, Mississippi County, Arkansas; shared program reporting context, not a surveyed Phase 2 footprintCypress Creek Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
July 2029 is EIA[1] planned month; day 1 is placeholder, not guaranteed COD. Operator2029 whole-program target and EIA Phase 3 July 2030 remain unresolved.
EIA August 2026 lists Cypress Creek’s Steel River Solar Phase 2, plant 70398, with 500 MW solar SRSP2 and separate 250 MW battery SRSB2, under construction at most 50% complete and planned for July 2029. Operator announced groundbreaking for the first two phases in July 2026.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
The airport's phase-two announcement has "19 modules planned in total by the project's completion in the summer of 2029" - a season, not a fixed day.[1]
Atlanta is rebuilding Concourse D in place, floating 19 prefabricated steel modules into position overnight to make the 1980s concourse about 60 percent wider and able to take larger aircraft while it keeps operating. Phase two began in January 2025 with the sixth module.
Steel River Phase 2 EIA plant 70398 shared reporting point, Mississippi County, Arkansas; not independently surveyed battery parcelCypress Creek Renewables LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA[2] planned month July 2029; day 1 is a month placeholder. Operator expects all phases by 2029, an unresolved discrepancy for Phase 3.
EIA’s September 2026 inventory identifies Steel River Solar Phase 2, plant 70398, with 250 MW battery SRSB2 and a separate 500 MW solar generator. It reports construction no more than 50% complete and July 2029 planned operation.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins50% CONFIDENCEOverall confidence: 50%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
July 2029 is the expected online date from the PJM queue entry AD2-077 as aggregated by Cleanview[1].
Energy Mountain is a planned 150 MW battery storage project listed in Bucks County, Pennsylvania in PJM, with expected commercial operation in July 2029. Energy capacity and developer are not confirmed by an opened source.
Labette County, Kansas, Neosho 345 kV POI context; exact GEN-2021-006 parcel unverified
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
July 15, 2029 is SPP’s[1] proposed COD, not actual commissioning.
SPP lists GEN-2021-006 as 300 MW battery storage at Neosho 345 kV in Labette County, Kansas, with July 15, 2029 proposed COD and IA fully executed/on-schedule status. The queue does not identify the developer or storage MWh.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: no official date yet. Reports since September 2025 have ufotable aiming for Part 2 in 2027 and the final film in 2029, keeping the two-year gap after Part 1 (Friday 18 July 2025), so the pin sits on the matching summer Friday, 20 July 2029.[1]
The third and final film of ufotable's Infinity Castle trilogy, closing Demon Slayer, is expected in Japanese theaters around July 2029; no date has been announced.
BLM land about 10 miles southeast of Pahrump, Clark and Nye counties, Nevada (federal dashboard coordinates)Clearway Energy Group
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Nevada Current[1] (4 Aug 2026): "Construction is expected to start in early 2027 and be completed by August 2029, according to Clearway Energy Group LLC's development plan"; the CAISO queue (via Cleanview) lists June 2029; the federal dashboard's permitting completion estimate is 18 September 2028.
Clearway Energy Group's proposed Mosey Solar Project would put 500 MW of solar (537 MW in the CAISO queue) with up to 850 MW of battery storage on about 3,565 acres of BLM land southeast of Pahrump, Nevada; BLM opened EIS scoping in July 2026 and no cost has been published.
M-62 & Daily Road, Cassopolis, Cass County, MI 49031
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-08-31 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
J4102 is a 539 MW photovoltaic generation interconnection request in Cass, MI. The grid operator lists its queue status as Active. The requested in-service date is 2029-08-31; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins61% CONFIDENCEOverall confidence: 61%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per the pin description: "…would be the tallest dam in the world. Estimated date.…"
At a planned 335 metres, Tajikistan's Rogun would be the tallest dam in the world. Estimated date.
Lancaster Clean Solar Energy Project, US Highway 77 & Saltillo Road Corridor, Lincoln, Lancaster County, NE 68516
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-09-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2021-049 is a 225 MW photovoltaic generation interconnection request in Lancaster, NE. The grid operator lists its queue status as IA FULLY EXECUTED/ON SCHEDULE. The requested in-service date is 2029-09-01; this is a planning date.
Brantley/Wayne County project vicinity, Georgia, USA (EIA reported point)BrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA[2] named plant September 2029 target, month precision; current operator scope and multiple EIA solar rows conflict.
BrightNight’s community page describes a 400 MW solar-and-battery project across 3,100 acres in Brantley and Wayne Counties. EIA lists separate 900 MW and 1,200 MW solar configurations plus 400 MW battery for the named plant; those cannot safely be added or substituted for the operator’s published scope.
Towns of Oasis, Hancock, Plainfield and Deerfield, Waushara County, WIDawn Break Solar, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
September 2029 is the planned operating date in EIA-based data (interconnection.fyi[2]); the PSC approval was reported by RENEW Wisconsin[1] but no construction schedule was found.
Dawn Break Solar is a hybrid project in Waushara County, Wisconsin, pairing a 180 MW solar farm with a battery energy storage system. The Public Service Commission of Wisconsin approved it on July 30, 2026, and EIA data lists a planned September 2029 operating date.
State Route 32 between Hortense and Browntown, Wayne & Brantley counties, Georgia, United StatesBrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins62% CONFIDENCEOverall confidence: 62%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA-860M and energy tracking databases target commercial operation for initial utility units around September 2029 (Cleanview[2] lists expected operation 2028-2029; date remains contingent on utility PPA awards and local abatement milestones).
BrightNight is developing the Pepper Hammock Solar and Storage Project across up to 3,100 acres in Wayne and Brantley counties, Georgia, spanning 400 MW in initial phase filings up to 1,200 MW in Cleanview (and EIA Plant 68367); total cost is not published while regional economic input during construction is projected at .3 million.
Moffat Storage Center, State Highway 13 Corridor, Craig, Moffat County, CO 81625
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-09-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GI-RSC-2025-02 is a 200 MW battery storage interconnection request in Moffat County, CO. The grid operator lists its queue status as IA FULLY EXECUTED/ON SCHEDULE. The requested in-service date is 2029-09-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins60% CONFIDENCEOverall confidence: 60%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed completion date comes from the PJM queue listing (aggregator interconnection.fyi[1]); no firm construction schedule was verified.
Bealeton Solar, LLC has a 14 MW solar project in the PJM interconnection queue (AH1-345) in Fauquier County, Virginia, queued in September 2021. The queue lists a proposed completion date of September 1, 2029.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The report states the line "is expected to start operations on 9-9-2029, the Roads and Transport Authority (RTA[3]) announced", a fixed announced day chosen to echo the metro's own 9-9-2009 opening.
The 30 km Blue Line adds 14 stations across Dubai Silicon Oasis, Academic City, International City, Dubai Creek Harbour, Mirdif and Al Warqa, with 15.5 km of underground track and 14.5 km elevated. The RTA awarded the construction contract to a consortium of MAPA, LIMAK and CRRC in December 2024 and expects 28 trains to carry 200,000 riders a day by 2030, rising to 320,000 by 2040.
Tin Top Road & Old Dennis Road, Weatherford, Parker County, TX 76087Nabla Park LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT[1] September 2026 row 1284, queue 27INR0571 projected COD; estimate with no IA.
ERCOT September 2026 lists Nabla Energy Storage I (27INR0571), Nabla Park LLC, at 750.0 MW and projected COD 2029-09-17, with screening complete, FIS started and no IA. The pin’s capacity-scaled cost and four-hour duration are unverified and cleared.
Duval County, Texas; Esri county-label point for coarse county context, not the project parcel or Cruce–San Miguel tapApricot Sun Energy Center, LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ERCOT September 2026 GIS identifies Apricot Sun Solar as 29INR0124, Apricot Sun Energy Center LLC, 200.84 MW in Duval County, targeting September 30, 2029. Screening is complete and full study started, without an IA.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
RCRC’s[1] approved-design release targets Q4 2029. October 1 is an estimated quarter anchor, not an announced opening day. Prequalification is not physical construction.
The 92,000-seat stadium rises in northern Riyadh along King Salman Road next to King Abdulaziz Park, its Populous design drawing on the surrounding mountainous landscape. It will be the Saudi national team's headquarters and the venue for the opening match and final of the 2034 World Cup, with a masterplan that adds an athletics stadium, training pitches and an aquatics centre with an Olympic-sized pool.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins45% CONFIDENCEOverall confidence: 45%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Proposed completion date is from EIA-860M data via an aggregator.[1]
Crooked Trail Solar is a planned 68 MW solar project in Penobscot County, Maine, with a proposed completion of October 2029 in EIA-based data. The listed operator is VCP Realty, LLC. No town-level site or official source was found.
About 10 miles southwest of Maupin, Wasco County, Oregon (Maupin town point used for coordinates)BrightNight
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Preliminary Application for Site Certificate (Dec 2025/Jan 2026), Background Information exhibit: construction targeted to start Q2 2027 after the site certificate, 24 to 32 months long, "Commercial Operations Date expected by Q4 2029".[1]
BrightNight's Deschutes Solar and Battery Energy Storage System in Wasco County, Oregon is a proposed 1,000 MW solar plant with up to 4,000 MWh of storage (BrightNight's page says up to 1,000 MWh) under state siting review since a January 2026 application; no cost has been published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins45% CONFIDENCEOverall confidence: 45%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
October 2029 is the EIA-860M proposed completion date via interconnection.fyi[1]; no developer or regulator source confirms it.
EIA-860M lists Lower Snake Solar Generation BESS, owned by LOSN, LLC, as a planned 600 MW two-unit plant in Garfield County, Washington, with a proposed completion of October 2029. Aggregators split it into a 300 MW solar unit and a 300 MW battery unit; no primary source was found.
Centre Block, Parliament Hill, Ottawa, Ontario, Canada
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins75% CONFIDENCEOverall confidence: 75%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Canada Elections Act fixes polling day as the third Monday of October in the fourth calendar year after the previous election, which is October 15, 2029; Kalshi's[1] event ticker carries the same date.
Kalshi
Canada's fixed-date law puts the next general election on the third Monday of October 2029, which is October 15. On 20 September 2026 Kalshi had the Liberal Party at 60%, the Conservative Party at 38% and the NDP at 3.5%; a lost confidence vote would bring the date forward.