- Start
- Jan 1, 197250% CONFIDENCEfrom the source
TAKRAF Commissions the First F60 Overburden Conveyor Bridge at Welzow
- The F60 is a series of five overburden conveyor bridges built by VEB TAKRAF in Lauchhammer, described as the largest movable technical industrial machines in the world; the first was built 1969-1972[2]
- Each is 502 m long, up to 80 m high, about 240 m wide and 13,600 tonnes, with 27 MW externally powered[2]
- Four still operate (Jaenschwalde, Welzow-Sued, Nochten, Reichwalde) and the fifth at Lichterfeld-Schacksdorf is open to visitors[2]
References 265% CONFIDENCE
The first entry is always the pin's source. Overall confidence is a weighted average of how firmly each reference supports the start and end times used above; a reference counts half as much for every 180 days older than the newest.
- [1]50%youtube.com/watch?v=9dudh7G0XTMyoutube.com· Posted Sep 15, 2026· Starts Jan 1, 1972 ✓· 50% of score
Wikipedia's[2] Overburden Conveyor Bridge F60 article dates the first unit's construction to 1969-1972 and entry into service at the Welzow open-pit mine to 1972, without a specific day.
- [2]80%Overburden Conveyor Bridge F60en.wikipedia.org· Added Sep 15, 2026· 50% of score
Documents the first F60 being built 1969-1972 and entering service at Welzow, and lists the F60 units still operating today.[1]
Suggest a correction
Something missing or wrong? Say it in your own words: a link that backs this pin up, a different start or end date and why, or a fact it lacks or gets wrong. The AI checks it against this pin's sources, searches for better ones, and adds any page that backs you up. The pin's own sources still count most.