第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
Airbus[4] and OCCAR delivery records state the first production A400M for Germany (MSN018) was handed over to the Luftwaffe on 18 December 2014, one day before it landed at its Wunstorf home base.
Wikipedia's A400M article says assembly of the first aircraft "began at the Seville plant of EADS Spain in early 2007", lists Germany's 53 as the largest national order, and gives the TP400-D6 powerplant and the aircraft's role between the C-130 and C-17.
The Bundeswehr's own A400M page says "The Airbus[4] A400M replaces the Transall C-160" and that the first was delivered on 18 December 2014, with its technical data.
Airbus states it handed over the first A400M to the Bundeswehr[3] on 18 December 2014.
OCCAR delivery documentation and Airbus[4] retrospectives confirm the first production A400M for Germany was delivered to the Luftwaffe on 18 December 2014, assembled at the Seville final assembly line.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。