原标题: SANDAG Committee Votes to Seek Proposals for an Airport Rail Link
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
日期确定:KPBS 报道称,委员会在“周五的会议上”“以 6 比 2 的投票支持 Anderson 的动议”,SANDAG[2][3] 日程显示交通委员会会议时间为“2026 年 9 月 18 日(周五)上午 9 点”(16:00 UTC)。
SANDAG's[3] own project page: the 2026 concept study addendum, the five remaining rail concepts, Route 992's 15-minute evening service from 6 September 2026 and the Rapid bus study; lists the 18 September 2026 Transportation Committee meeting.
SANDAG's[2] calendar entry dates and times the meeting: "Friday, September 18, 2026 9 a.m. Regular Session In Person", with the agenda and meeting video.
North County Pipeline report of the 6-2 vote to dual-track the RFP and RFI, with the $1.5-3.1 billion project range and the corrected $25-40 million environmental cost.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。