原标题: Connect Bay Area Transit Tax Qualifies for the November 2026 Ballot
第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
据 MTC 2026 年 7 月 1 日的新闻稿,事件已完成:“昨天,公共交通收入提案特区(‘特区’)的选举官员认证,Connect Bay Area 公交倡议的发起人……已提交足够的有效签名”;ContraCosta.news[5]:“MTC 于 6 月 30 日发出正式认证”。
District page: notice of intent on 16 Jan 2026, the SB 63 tax rates, the certificate, and the 24 July 2026 resolution asking the counties to consolidate with the 3 Nov election.[1]
Trade coverage of the qualification with the same coalition and fundraising figures.[1]
The certificate itself (corrected 1 July 2026): 306,288 raw signatures, 187,119 required, 235,503 estimated valid against the 205,831 threshold.[1]
Campaign release as published: certification sent on June 30, more than 305,000 signatures submitted in May, agencies funded, $5.5M raised.[1]
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。