Confirmed commercial operation date of June 2023 from utility interconnection and facility commissioning records.[1]
Aligned Data Centers operates the 4.43B USD, 163.1 MW total capacity (116.5 MW IT load) 624,570 sq ft hyperscale computing facility on Transload Road in Sterling, Loudoun County, Virginia, powered by Dominion Energy.