Boston City Hall, 1, Congress Street, Government Center/Faneuil Hall, Downtown, Boston, Suffolk County, Massachusetts, 02201, United StatesCity of Boston
Estimated: Van Buren Charter Township, Wayne County, Michigan 48111, United States (approximate: township centroid; the site is 282 acres north of I-94 between Haggerty Road and I-275)Google
Estimated: About 11 miles southeast of Yerington, Mineral and Lyon Counties, Nevada, United States (approximate site point from BLM description)Arevia Power
EIA-860M(Interconnection.fyi[2][3]的69198和69199号电厂):Atlas Solar X和XI的预计完工日期均为2027年12月1日;Parker Pioneer的文章没有给出施工或运营日期。
174 Power Global(Hanwha)的子公司Atlas Solar X和XI于2024年8月19日获得拉巴斯县有条件使用许可,将在3,495英亩BLM土地上建设600 MW的Jove Solar Project;EIA列出225 + 200 = 425 MW,计划2027年12月完工;成本未公布。