Stagecoach LRE Solar Facility, Interstate 25 Corridor, Pueblo, Pueblo County, CO 81004Longroad Energy
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated commercial operation target of December 2029 based on regional grid generator interconnection queue schedule and state regulatory filings.[1]
Development of the Stagecoach LRE Clean Solar Project in Pueblo County, Colorado. Generating 230 MWac of clean photovoltaic power, the facility interconnects directly to the regional high-voltage transmission grid to replace retiring coal generation with zero-carbon renewable power across southern Colorado.
Swiss Valley Energy Storage Facility, State Route 20A & Meyer Transmission Corridor, Warsaw, Wyoming County, NY 14569Sawhall Energy Storage LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-12 is the requested commercial-operation month in NYISO[1][3]. Day 01 is only a month-precision anchor, not an announced commissioning day.
C24-352 is a 300 MW battery storage interconnection request in Wyoming, NY. The grid operator lists its queue status as Active interconnection request. The requested in-service date is 2029-12-01; this is a planning date.
Sugar Loaf Energy Storage Center I, Sugar Loaf Bypass & Kings Highway Substation Corridor, Chester, Orange County, NY 10918Hambletonian Energy Storage LLC
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2029-12 is the requested commercial-operation month in NYISO[1][3]. Day 01 is only a month-precision anchor, not an announced commissioning day.
C24-358 is a 300 MW battery storage interconnection request in Orange, NY. The grid operator lists its queue status as Active interconnection request. The requested in-service date is 2029-12-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA-860M proposed dates (2028-2029) as shown by interconnection.fyi[1] (aggregator).
Panther Branch Solar, LLC is a planned solar and battery plant in Duplin County, North Carolina, with two generators totaling 112 MW, operated by Cypress Creek Renewables. EIA-based data propose the units for 2028-2029 and plant completion for December 2029; the battery's own MW/MWh is not published.
Estimated: Rowan Percheron Data Center Campus Building 4, Tower Road & East Columbia Avenue Corridor, Boardman, Morrow County, OR 97818Rowan Digital Infrastructure
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed COD of 2029-12-31 comes from the ERCOT queue record as shown by Infrasure[1]; no firm developer date.
Kickstart Energy Storage VI is a proposed 1,026.2 MW battery project by Kickstart Infrastructure LLC in the ERCOT queue (29INR0218), Ellis County, Texas. It entered the queue December 17, 2025 with a proposed commercial operation date of December 31, 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
December 1, 2029 is the proposed completion date on PJM queue entry AH1-260 as shown by interconnection.fyi[1][2]; no developer schedule found.
Haddy Energy Storage LLC has a 300 MW battery project active in the PJM queue (AH1-260) in Camden County, New Jersey, with a proposed completion date of December 1, 2029. No permit, site or construction information was found.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Proposed COD of 2029-12-01 comes from the ERCOT queue record 24INR0134 as shown by infrasure.ai[1] and cleanview.co[2] aggregators; no interconnection agreement is executed.
BRP Hemera BESS is a proposed 207 MW (206.96 MW) battery storage project in Deaf Smith County, Texas, in the ERCOT queue as 24INR0134. It would connect at the 345 kV Deaf Smith Substation (Oncor) with a proposed commercial operation date of December 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Developer coverage (PV Tech[1], May 2026) gives only a 2029 commercial operation target; the SPP queue aggregator lists a proposed COD of 2029-12-01.
Solstice is a 250 MWdc solar project being developed by Enlight's US subsidiary Clenera Holdings in LeFlore County, Oklahoma, with 200 MWac contracted to Google under a power purchase agreement. A second phase is planned to add 800 MWh of battery storage. Construction is expected to begin in 2028 with commercial operation targeted for 2029.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA's September 2026 inventory proposes December 2029 (status T, regulatory approvals received, not under construction); direct testimony in SC PSC docket 2024-203-E requested a commercial operation date of November 1, 2028. The conflict is unresolved, so the later EIA date stays as the pin date. Coordinates are the Williamsburg County centroid, not a site.[1]
Kingstree East 230 LLC's proposed 249 MWac single-axis-tracking solar project (the SC PSC docket 2024-203-E application calls it a solar and battery facility) is planned for Williamsburg County, South Carolina, interconnecting with Santee Cooper's Winyah-Hemingway 230 kV line. Direct testimony in the docket gives a requested commercial operation date of November 1, 2028; the EIA preliminary inventory instead lists December 2029 and, with other trackers, places it in Georgetown County. No construction start or cost is published.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins53% CONFIDENCEOverall confidence: 53%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
EIA-860M proposed date shown by interconnection.fyi[1] and Cleanview[2] (December 2029); no firm date.
Caverns Solar is a planned 75 MW solar PV plant in Jackson County, Florida, listed in EIA-860M data with operator CVSO, LLC and a proposed completion of December 2029. No developer announcement or site was found.
Callahan Road, QDC Business Park, North Kingstown, RIGreen Development
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
ISO-NE queue 1163 (205 MW, POI near Davisville) lists a proposed completion of 7 December 2029 per Infrasure[2]; ecoRI[1] says construction would begin later in 2026 and finish around summer 2029, with the facility online by the end of the decade.
Green Development and the Quonset Development Corporation propose a 208 MW lithium-iron-phosphate battery on about 10 acres along Callahan Road in North Kingstown, Rhode Island, before the state Energy Facility Siting Board; cost is confidential and unpublished.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
MISO requested in-service date, not confirmed construction or operation.
MISO lists active J4016, a 300 MW battery request in Tuscola County, Michigan, at the Atlanta–Thetford [Karn] 138 kV connection. Its requested in-service date is December 30, 2029; developer ownership is not identified.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Given as scheduled, per the source[1]: the line "is on track to be opened for service in late 2029."
Metro Vancouver is spending CAD $6BN extending the SkyTrain Expo Line 16km from Surrey to Langley, after scrapping a cheaper light-rail plan that would already have opened.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 7 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
No landing date is set. The market’s heaviest year is 2029, which carries about 31 of the 44 points priced before 2030 (13% before 2029 rising to 44% before 2030), and a year-only date takes its last day. The 2027 and 2028 rungs are thinly traded and add under 3 points between them. The figures are the chance in the strike list; the order ticket reads 49% for the same before-2030 contract.[1]
Kalshi
Kalshi
On 20 September 2026 Kalshi’s moon-landing market priced a crewed NASA landing at 1.3% before 2027, 2.3% before 2028, 13% before 2029 and 44% before 2030 — putting the largest single year of probability, about 31 points, on 2029. The companion market had the United States as the next country to do it at 55%, with China at 28%.
Boston City Hall, 1, Congress Street, Government Center/Faneuil Hall, Downtown, Boston, Suffolk County, Massachusetts, 02201, United StatesCity of Boston
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Set in law, per the BERDO ordinance: Table 1's "2030-2034" emissions standards, and mid-size buildings "shall not be subject to the Emissions standards until 2031, reporting for 2030 emissions"; the period ends where the 2035-2039 standards begin.[1]
Boston's BERDO emissions limits drop by roughly 40% for offices and multifamily housing in 2030, and mid-size buildings of 20,000-35,000 sq ft or 15-34 units must comply for the first time.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
MISO requested future in-service date; not confirmed construction or commercial operation.
MISO lists J3964 as an active 490 MW solar interconnection request in Brookings County, South Dakota, in DPP 2025 Phase 1. Its requested in-service date is 2030-01-31. The queue does not identify developer ownership or a final array parcel.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins52% CONFIDENCEOverall confidence: 52%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Given as a target, not a fixed date, per the pin description: "…pine resorts rather than one host city. Estimated date.…"
The Winter Games return to France for the fourth time, spread across Alpine resorts rather than one host city. Estimated date.
Estimated: TeraWulf Muskie Campus Building 3, US Route 23 Industrial Corridor, Catlettsburg, Boyd County, KY 41129TeraWulf
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
Syracuse Clean Solar Energy Center, State Highway 2 & State Highway 50 Corridor, Syracuse, Otoe County, NE 68446
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2030-02-15 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
GEN-2020-094 is a 250 MW photovoltaic generation interconnection request in Syracuse, NE. The grid operator lists its queue status as IA FULLY EXECUTED/ON SCHEDULE. The requested in-service date is 2030-02-15; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
MISO requested future in-service date; not confirmed construction or commercial operation.
MISO lists J3975 as an active 416.5 MW solar interconnection request in Rusk County, Wisconsin, in DPP 2025 Phase 1. Its requested in-service date is 2030-02-20. The queue does not identify developer ownership or a final array parcel.
Fort Worth Convention Center, 1201 Houston Street, Fort Worth, TX 76102, United StatesCity of Fort Worth
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Visit Fort Worth[1] states Completion Early 2030. March 31 is an estimated first-quarter anchor, not an exact completion day; October 2026 Chamber reporting also gives late 2029, so the differing target descriptions remain explicit.
Phase 2 tears down the convention center's 1968 arena and replaces it with a four-storey building and a new ballroom, finishing a rebuild whose first phase added 76,000 square feet and wrapped up in winter 2025. The centre stays open to events through the work.
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
NASA's largest planetary probe begins dozens of flybys of Europa to assess whether its subsurface ocean could support life. Scheduled date.
Wilmarth-Fieldon Solar Complex, State Highway 60 Corridor, Mankato, Blue Earth County, MN 56001
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
2030-05-01 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
J4017 is a 299 MW photovoltaic generation interconnection request in Blue Earth, MN. The grid operator lists its queue status as Active. The requested in-service date is 2030-05-01; this is a planning date.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
AES schedule shows construction 2027-2030 and operations from 2030, subject to change; May 2030 is the EIA proposed month.[1]
AES Hawaii's pre-construction Ke'amuku project pairs an 86 MW solar array with a 344 MWh battery near Waikoloa Village on Hawaii Island. It has a power purchase agreement with Hawaiian Electric under PUC review, with operations planned from 2030.
Estimated: TeraWulf Muskie Campus Building 4, US Route 23 Industrial Corridor, Catlettsburg, Boyd County, KY 41129TeraWulf
UNVERIFIEDDate confidence: UNVERIFIEDNo wording about the date was foundHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all UNVERIFIED pins40% CONFIDENCEOverall confidence: 40%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 49% confidence or below
Separate construction cost, IT power, floor area and an opening date for this building or phase have not been verified. Published campus figures do not establish independent component figures.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins55% CONFIDENCEOverall confidence: 55%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Date is the SPP queue proposed completion date as mirrored by interconnection.fyi[1] (aggregator); not a developer-confirmed schedule.
A 201.6 MW battery storage project in the Southwest Power Pool interconnection queue (GEN-2017-227), interconnecting at Gordon Evans 138kV in Sedgwick County, Kansas. The queue lists a proposed completion date of May 15, 2030; the developer is not published on the pages found.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
No day is given. Engadget[3] reports that Blizzard's BlizzCon 2026 announcement puts the game in spring 2030 ("the announcement says it's coming in spring 2030"), while IGN[1] and Kotaku[2] give only the year, with GM Dan Hay calling 2030 "solid". Dated to the last day of that season as an estimate.
Blizzard confirmed its next StarCraft game abandons the RTS format for an open-world shooter, with development leads calling 2030 a "solid" release target meant to keep the team honest and focused.
8000 SW 12th Street, Lincoln, Nebraska; Esri geocoded SPP Rokeby Station address, not verified storage parcel
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Current SPP[1] proposed COD is May 31, 2030; requested future date, not realized service.
SPP’s active queue lists GEN-2021-043, 250 MW battery storage in Lancaster County, Nebraska, at the Rokeby Station 115 kV bus with a May 31, 2030 target and IA fully executed/on-schedule status. It does not identify the developer or a battery parcel.
Estimated: Johnston County, Oklahoma; approximate county context, exact GEN-2024-338 solar parcel pending
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
May 31, 2030 is SPP’s[1] proposed COD, not a confirmed opening.
SPP identifies GEN-2024-338 as a 350 MW solar request in Johnston County, Oklahoma, at Pittsburg–Johnston County 345 kV. The request is in DISIS study and carries May 31, 2030 proposed COD, with AEP as transmission utility.