CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
SK hynix's[1][3] newsroom release is datelined "Seoul, September 12, 2025" and TrendForce[5] reported it the same day (2025-09-12).
On 12 September 2025 SK hynix announced it had finished developing HBM4, the sixth generation of high-bandwidth memory, and prepared mass production, with double the bandwidth of the previous generation and more than 40% better power efficiency.
Volodarsky District, Nizhny Novgorod Oblast, Volga Federal District, RussiaRussian Armed Forces
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Kremlin[1], 16 September 2025: 'The exercise is being held on September 12 through 16 at 41 land and sea training grounds in both countries.'
Russia and Belarus held their first Zapad joint strategic exercise since the invasion of Ukraine, which Putin said involved 100,000 troops at 41 ranges and included practice with nuclear weapons and the Oreshnik missile, as Poland shut its border with Belarus.
J. Edgar Hoover Building, 935, Pennsylvania Avenue Northwest, Penn Quarter, Ward 2, Washington, District of Columbia, 20535, United StatesFederal Bureau of Investigation
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins89% CONFIDENCEOverall confidence: 89%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The FBI's TLP:CLEAR alert is headed '12 September 2025' with FLASH number 'FLASH-20250912-001'.[1]
The FBI published indicators for two crews stealing companies' Salesforce data, one by phoning staff posing as IT support, the other with stolen Salesloft Drift tokens.
225, South Sepulveda Boulevard, Hill Section, Manhattan Beach, Los Angeles County, California, 90266, United StatesSkechers
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins89% CONFIDENCEOverall confidence: 89%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Skechers[1][2]' and 3G Capital's own joint release is timestamped "Sep 12, 2025 • 9:15 am EDT" (13:15 UTC), stating the acquisition "has completed" and that shares stop trading on the NYSE that day.
3G Capital completed its $9.4 billion acquisition of Skechers, taking the world's third-largest footwear company private and ending its run on the NYSE, four months after the deal was announced.
Allegiant Stadium, 3333 Al Davis Way, Las Vegas, Nevada 89118, United StatesTKO Group Holdings
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Wikipedia[2]: "The bout took place on September 13, 2025, at Allegiant Stadium in Paradise, Nevada"; Ring's result story is stamped the following night UTC.
Terence Crawford outboxed Canelo Alvarez over 12 rounds before 70,482 fans, a record crowd for Allegiant Stadium, to become undisputed champion in a third weight class.
HAK, Salzwasserdurchfahrt, Automotive Testing Papenburg, Papenburg, Landkreis Emsland, Niedersachsen, 26871, DeutschlandBYD Company
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
BYD's[1][4] release: 'The feat was achieved with YANGWANG's latest U9 Xtreme hypercar on 14 September 2025' (announced 22 September 2025).
BYD's Yangwang U9 Xtreme reached 496.22 km/h at ATP Papenburg in Germany on 14 September 2025, beating the Bugatti Chiron Super Sport 300+'s 490.484 km/h, in BYD's claim as the fastest production car.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Infrastructure works start: the source[1] specifies this exact day. This is not an opening date.
Microsoft reports urban development works began September 15, 2025. Excavation, utilities, and access roads support a new data-center site; main building completion and opening are unverified.
Supreme Court, Jalan Veteran II, RW 02, Gambir, Central Jakarta, Special Capital Region of Jakarta, 10110, IndonesiaWilmar International
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Antara, quoting the Supreme Court register: 'Putusan diketok pada Senin (15/9) sejak perkara diterima pada Rabu (30/4)'.[1]
Indonesia's Supreme Court found five Wilmar subsidiaries guilty in the cooking-oil export case, fining each Rp 1 billion and ordering Rp 11.88 trillion (about US$709 million) in compensation, which Wilmar said would push it to a third-quarter loss.
1211 Avenue of the Americas, Manhattan, United StatesFOX
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins95% CONFIDENCEOverall confidence: 95%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better7.4/1022 episodes
TVmaze[1][2] records the Season 2 premiere date as 2025-09-14 on FOX.
Doc centers on the hard-charging, brilliant Dr. Amy Larsen, Chief of Internal and Family Medicine at Westside Hospital in Minneapolis. After a brain injury erases the last eight years of her life, Amy must navigate an unfamiliar world where she has no recollection of patients she's treated, colleagues she's crossed, the soulmate she divorced, the man she now loves and the tragedy that caused her to push everyone away. She can rely only on her estranged 17-year-old daughter, whom she remembers as a 9-year-old, and a handful of devoted friends, as she struggles to continue practicing medicine, despite having lost nearly a decade of knowledge and experience. Season 2 premiere, "Her Heart": Amy's past comes back to haunt her when a desperate father sacrifices everything to secure his daughter's heart transplant. Aired on FOX.
Nelson Mandela Marg, Vasant Kunj, South, Delhi, South Delhi, Delhi, 110070, IndiaMaruti Suzuki
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Carlelo[1] (published 2025-09-15): "The much-anticipated Maruti Suzuki[2] Victoris has finally been launched at a starting price of Rs 10.5 lakh, ex-showroom (introductory)."
Maruti Suzuki launched the Victoris midsize SUV in India on 15 September 2025 at an introductory Rs 10.5 lakh ex-showroom, with a 103 hp mild-hybrid petrol rated at 21.18 kpl by ARAI.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
OpenAI's[1][2][3] own model release notes date this entry Sep 15, 2025
OpenAI adds GPT-5-Codex, a GPT-5 variant optimized for agentic coding, across Codex.
Centre William Rappard, 154, Rue de Lausanne, Sécheron, Pâquis, Genève, 1202, Schweiz/Suisse/Svizzera/SvizraWorld Trade Organization
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins89% CONFIDENCEOverall confidence: 89%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The WTO's[1][2][3] acceptances page states: 'The Agreement entered into force on 15 September 2025 once two-thirds of WTO members had formally accepted the Protocol'; no clock time is given.
The WTO's first agreement with environmental sustainability at its core took effect once two-thirds of members had accepted it, banning subsidies for illegal fishing, for fishing overfished stocks and for fishing on the unregulated high seas.
40, Rue de Sèvres, Quartier Saint-Thomas-d'Aquin, Paris 7e Arrondissement, Paris, Île-de-France, 75007, FranceKering
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Kering's board announcement, dated 16 June 2025, says 'Luca de Meo will take office on September 15, 2025', subject to a shareholder meeting called for 9 September; the pin uses the office-taking date.[1]
Former Renault chief Luca de Meo becomes Kering's chief executive on 15 September 2025, the first time the luxury group is run by someone outside the Pinault family, as chairman François-Henri Pinault steps back from day-to-day management.
5600, Avenida Encinas, Farr, Carlsbad Ranch, Carlsbad, San Diego County, California, 92008, United StatesVuori
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Business Wire release is datelined 'ENCINITAS, Calif., September 15, 2025 --(BUSINESS WIRE)-- Vuori ... today announced the appointment of Andrew Campion' and timestamped 10:00 UTC.[1]
Andrew Campion, Nike's former chief operating officer and chief financial officer and now CEO of Unrivaled Sports, joined Vuori's board of directors and its audit committee.
2300, Oracle Way, Lakeshore, Austin, Travis County, Texas, 78741, United StatesOracle
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Datelined "Austin, Texas—Sep 16, 2025": "Oracle[1] today announced the availability of Java 25"; PR Newswire[3] stamp 10:30 ET.
JDK 25 shipped with 18 JEPs, from compact source files and scoped values to compact object headers, and Oracle will support it for at least eight years.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Stated as firm, per sf.gov[1][2]: "the Department of Elections certified the results for the September 16, 2025, Special Recall Election"; the Final Summary Report gives Yes 13,474 (62.72%).
District 4 voters removed Supervisor Joel Engardio 62.7% to 37.3% in a special recall election, after he backed Prop K, which closed part of the Great Highway to make Sunset Dunes park.
Criminal Courts Building, Centre Street, Civic Center, Lower Manhattan, Manhattan, New York County, New York, 10013, United StatesNew York Supreme Court
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Guardian[1], 16 September 2025: a judge "dismissed the two top state charges" in "a written decision that was posted during a 15-minute proceeding in Manhattan court on Tuesday".
Justice Gregory Carro threw out the two terrorism-based murder counts against Luigi Mangione as legally insufficient but let the second-degree murder and weapons charges in the killing of UnitedHealthcare CEO Brian Thompson stand.
Exchange Square, 8 Connaught Place, Central, Central and Western District, Hong Kong Island, Hong Kong, ChinaHesai Group
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CnEVPost[1][3][4], 16 September 2025: Hesai 'was officially listed on the main board of the Hong Kong Stock Exchange today' (trading opens 09:30 Hong Kong time, 01:30 UTC); the earlier offering notice gave 'Sept 16' as the start of trading.
Hesai Group, the Shanghai-based LiDAR supplier to many Chinese EV makers, began trading in Hong Kong on 16 September 2025, rose 11% to HK$236.2 and raised HK$4.16 billion, the largest listing in the global LiDAR industry.
Superior Court of California, 118, East Figueroa Street, Santa Barbara, Santa Barbara County, California, 93101, United StatesSable Offshore
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Santa Barbara Independent[1] (19 Sep 2025): Savrnoch 'slapped Sable Offshore Corp. with 21 criminal charges on Tuesday' - 16 September, the filing date Sable's 10-Q also gives.
District Attorney John Savrnoch charged Sable with five felony Water Code counts for knowingly discharging fill into waterways and 16 Fish and Game Code misdemeanors over its pipeline repair digs at creeks such as Arroyo Quemada and Nojoqui Creek. Sable called the charges politically motivated and misleading.
Tesla Gigafactory Texas Main Building, 1, Tesla Road, Austin, Travis County, Texas, 78725, United StatesTesla
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The filing is the Form DEF 14A on SEC[1][3] EDGAR dated 17 September 2025 (accession 0001104659-25-090866); its Summary Compensation Table covers fiscal 2024, which ended 31 December 2024.
Tesla's 2025 proxy lists fiscal 2024 pay: Elon Musk $0, CFO Vaibhav Taneja $139.5M, Tom Zhu $0.5M and ex-executive Andrew Baglino $0.1M; the CEO pay ratio is 0.00 to 1.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
No energization date exists; the date used is Tract's 17 September 2025 announcement that it closed on the land after rezoning and a development agreement with Lyon County.[1]
Tract bought about 1,060 acres at Silver Springs in Lyon County, Nevada after a county rezoning and development agreement; the site could support 1.6 GW with an initial 700 MW under utility study, and no cost has been published.
Al Hada District, Shmeisi Municipality, Riyadh, Riyadh governorate, Riyadh Region, 12916, Saudi ArabiaGovernment of Pakistan
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins79% CONFIDENCEOverall confidence: 79%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Pakistan's joint statement: the prime minister 'paid a state visit to the Kingdom of Saudi Arabia on 25/3/1447H, corresponding to 17 September 2025', where the two leaders 'signed the "Strategic Mutual Defense Agreement"'.[1]
Crown Prince Mohammed bin Salman and Prime Minister Shehbaz Sharif signed a pact under which 'any aggression against either country shall be considered an aggression against both', binding the world's top oil exporter to nuclear-armed Pakistan.
Marriner S. Eccles Federal Reserve Board Building, 20th St & Constitution Ave NW, Washington, DCFederal Reserve
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Federal Reserve's[1][2][3] statement is dated 17 September 2025 and marked for release at 2:00 p.m. ET, matching the 16-17 September meeting on its calendar and the resolution date of the Kalshi[4] and Polymarket[5] decision markets.
Kalshi
Polymarket
The FOMC lowered the federal funds target range by 1/4 percentage point to 4 to 4-1/4 percent on 17 September 2025 by an 11-1 vote, with Stephen Miran preferring a half-point cut.
Phillip Burton Federal Building & United States Courthouse, 450, Golden Gate Avenue, Civic Center, San Francisco, California, 94102, United StatesHermès
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The order itself is dated "Dated: September 17, 2025" and signed by Judge James Donato, closing the case.[1]
U.S. District Judge James Donato dismissed with prejudice the Sherman Act claims that Hermès illegally tied Birkin bag sales to other purchases, ruling the plaintiffs never defined a viable product market or showed harm to competition.
341 George Street, Sydney, New South Wales, AustraliaAtlassian
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
TechCrunch[1] (2025-09-18), SiliconANGLE[4] (2025-09-18) and Reuters via BNN Bloomberg[3] ('Published: September 18, 2025') all report Atlassian announcing the DX deal 'on Thursday' 18 September 2025.
On 18 September 2025 Atlassian agreed to buy DX, an engineering-intelligence platform that measures developer productivity, for about US$1 billion in cash and restricted stock, its largest acquisition to date.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed announced milestone: Phase I grand opening celebrated September 18, 2025. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
60 affordable studio and one-bedroom apartments for adults 55+. September 2025 opening report specifies 12 homes at 30% AMI, six at 40%, 24 at 50% and 18 at 60%. Phase I grand opening celebrated September 18, 2025. Published rents: Studio, 448 sq ft $1,010, 1 bedroom, 651 sq ft $507–$1,138.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed announced milestone: Operator announced the grand opening September 18, 2025. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
The Gray provides 135 affordable one- and two-bedroom apartments for adults aged 55+ in the Third Ward, with eligibility at 30%–60% AMI. Operator announced the grand opening September 18, 2025.
7015 Adams Park Road, Twiggs County, Georgia, United StatesEagle Rock Partners
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins77% CONFIDENCEOverall confidence: 77%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
GovTech[4]/Macon Telegraph (29 September 2025): commissioners "unanimously voted to rezone about 300 acres for the data center project on Sept. 18"; no operating date has been published (Baxtel[2] lists 2030), so the pin is dated to the rezoning.
Charlotte-based Eagle Rock Partners won a unanimous Twiggs County rezoning of 291.5 acres off Adams Park Road, Georgia, on 18 September 2025 for a 900 MW data center campus whose site application cites a 5B USD investment; residents sued within days and the transmission utility reportedly cannot deliver the power until late 2028.
25, Drydock Avenue, Seaport, Boston, Suffolk County, Massachusetts, 02210, United StatesReebok
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Sneaker Bar Detroit[1] (original story 15 Aug 2025): "The Reebok Angel Reese 1 “Receipts Ready” will release on September 18, 2025 available at Reebok.com and select retailers. The retail price tag is set at $130 USD."
Angel Reese's first signature basketball shoe arrives in a white, black and Energy Red “Receipts Ready” colorway with a sculpted angel-wing TPU exoskeleton, for $130.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Confirmed announced milestone: Grand opening celebrated September 18, 2025. The date records the stated ceremony or dated announcement; it does not imply current apartment availability.[1]
Flo offers 212 one- and two-bedroom apartments for adults 55+ and non-senior adults with disabilities in Sun Valley. Grand opening celebrated September 18, 2025. Published rents: Main pricing section: 1 bedroom $1,249, Main pricing section: 2 bedrooms $1,499, Some application-form branches: 1 bedroom From $1,539.
James Lawrence King Federal Justice Building, 401, Northeast 1st Avenue, Torch of Friendship, Miami, Miami-Dade County, Florida, 33132, United StatesHershey
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Stated as firm on the order itself: "Case 0:24-cv-60831-MD Document 47 Entered on FLSD Docket 09/19/2025", "ORDER GRANTING MOTION TO DISMISS [ECF NO. 24]".[1]
US District Judge Melissa Damian threw out a Florida class action claiming Reese's Peanut Butter Pumpkins lacked the carved eyes and mouths pictured on the pack, finding the buyers had shown no concrete injury.
Xiaomi Science and Technology Park, 33, Qinghe Subdistrict, Haidian District, Beijing, ChinaXiaomi
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins79% CONFIDENCEOverall confidence: 79%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CnEVPost[1][3][4], 19 September 2025: 'Effective immediately, Xiaomi EV is recalling a total of 116,887 SU7 Standard Edition EVs ... according to an announcement on ... the SAMR website'.
On 19 September 2025 Xiaomi began recalling 116,887 SU7 Standard cars built between February 2024 and August 2025, because highway driver assistance may fail to handle extreme scenarios; the fix is an over-the-air update.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins62% CONFIDENCEOverall confidence: 62%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Shinsegae International said on 19 September 2025 that Vuori "opened its largest store in Korea at Starfield Hanam this month" (이달 ... 오픈했다고 19일 밝혔다); no day is given, so the announcement day is the latest it could be.[1]
Shinsegae International opened Vuori's biggest store in South Korea, 281 square metres on the ground floor of Starfield Hanam east of Seoul, about five times the size of its earlier Korean shops.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins89% CONFIDENCEOverall confidence: 89%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NBC Los Angeles[1] (published September 19, 2025): "The Metro[2] A Line extension opens Friday"; Metro's own video adds "Four new stations open this Friday, September 19 ... First ride is at noon!" (12:00 PDT = 19:00Z).
Nine miles of light rail and four new stations in Glendora, San Dimas, La Verne and Pomona, bringing trains back to the eastern San Gabriel Valley for the first time since 1951 on a $1.5 billion extension.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better83%
Theatrical release date confirmed on the title's own MyAnimeList[1] listing.
ROCK'N ROLL MOUNTAIN's 100 METERS releases in Japanese theaters, a sports drama following sprinter Togashi and his determined rival Komiya as their childhood rivalry on the track carries into adulthood.
Los Angeles, Los Angeles County, California, United StatesHuman Re Sources
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NME's[1] report reads 'Today (September 19) ... shared Where Is My Husband!' as the first preview of her second album, with a music video; no time is given, so the day is all-day.
On 19 September 2025 RAYE released 'WHERE IS MY HUSBAND!', the first single from her second album, and announced the This Tour May Contain New Music tour. It reached No. 1 on the UK singles chart in its 15th week.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins92% CONFIDENCEOverall confidence: 92%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better92%
Theatrical release date confirmed on the title's own MyAnimeList[1] listing.
MAPPA's Chainsaw Man – The Movie: Reze Arc opens in Japanese theaters, adapting the manga's Reze arc as Denji, now working as a Special Division 4 devil hunter, meets a mysterious café worker with a hidden connection to a Bomb Devil.
杭州大会展中心, 赭美路, Nanyang, Xiaoshan District, Hangzhou City, Zhejiang, 311215, ChinaNIO
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins81% CONFIDENCEOverall confidence: 81%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NIO's[1][5] release is dated "September 20, 2025, Hangzhou" and says NIO Day 2025 "took place at the Hangzhou Grand Convention and Exhibition Center" where the All-New ES8 "was officially launched".
At NIO Day 2025 in Hangzhou on 20 September, NIO launched the third-generation ES8 from RMB 406,800 (RMB 298,800 with BaaS), with deliveries from 21 September, and the ET9 Horizon Edition from RMB 818,000.
2300, Oracle Way, Lakeshore, Austin, Travis County, Texas, 78741, United StatesOracle
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins90% CONFIDENCEOverall confidence: 90%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The release is datelined "Austin, Texas—Sep 22, 2025", PR Newswire[3] stamps it "Sep 22, 2025, 08:00 ET", and the 8-K makes the changes "effective as of September 22, 2025".
Oracle promoted cloud chief Clay Magouyrk and industries chief Mike Sicilia to joint chief executives, ending Safra Catz's 11 years as CEO; she became executive vice chair of the board.
Shangcheng District, Hangzhou City, Zhejiang, ChinaDeepSeek
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
DeepSeek's[1][3] post "DeepSeek-V3.1 is now DeepSeek-V3.1-Terminus" is dated September 22, 2025 and says it is "Available now on: App / Web / API"; its changelog lists "Date: 2025-09-22 DeepSeek-V3.1-Terminus" and The Decoder[5] reported it that day.
DeepSeek updates DeepSeek-V3.1 to V3.1-Terminus, an open-weight refinement that cuts Chinese-English language mixing and lifts its Code and Search Agents, raising BrowseComp from 30.0 to 38.5 and Terminal-bench from 31.3 to 36.7.
Berkshire Hathaway Headquarters, 3555, Farnam Street, Blackstone, Omaha, Douglas County, Nebraska, 68131, United StatesBYD Company
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CnEVPost[1], 22 September 2025: 'Berkshire Hathaway ... has completely liquidated its stake in BYD', citing CNBC's report the day before; the sale itself was disclosed through a March 2025 quarterly report.
Berkshire Hathaway has sold all of its BYD shares, reported on 22 September 2025, 17 years after Warren Buffett's MidAmerican paid US$230 million for about 10% of the Chinese carmaker.
Lancium Clean Campus, Abilene, Taylor County, Texas, United StatesOracle
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
OpenAI's[1][4] post is dated 'September 23, 2025': 'OpenAI, Oracle, and SoftBank are announcing five new U.S. AI data center sites under Stargate'.
Three new Oracle-built campuses in Shackelford County, Texas, Doña Ana County, New Mexico and the Midwest, plus two SoftBank sites, took Stargate to nearly 7 GW; OpenAI put its Oracle partnership above $300 billion over five years.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Stated as firm, per san.org[1]'s release dated September 23, 2025: "Today, the San Diego County Regional Airport Authority celebrated the official opening of the first phase of the new Terminal 1 at San Diego International Airport."
The first phase of San Diego International Airport's $3.8 billion New Terminal 1 opened with 19 gates, a 13-lane security checkpoint and 17 restaurants and shops, replacing the 58-year-old Terminal 1. Southwest Flight 2866 from Honolulu was its first arrival the night before.
Wuchang, Yuhang District, Hangzhou City, Zhejiang, ChinaAlibaba Cloud
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins86% CONFIDENCEOverall confidence: 86%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Simon Willison's[5] post of 23 September 2025 quotes Alibaba's "Firstly, we are open-sourcing the flagship model of this series"; the Hugging Face[1] weights for the Instruct (05:25Z) and Thinking (04:16Z) repositories finished uploading on 23 September and OpenRouter[6] lists the Instruct model at 23 September, with The Decoder[4] reporting it on 25 September.
Alibaba open-sources the flagship Qwen3-VL-235B-A22B in Instruct and Thinking versions, a 235B vision-language mixture-of-experts with a 256K-token native context that Alibaba says matches or exceeds Gemini 2.5 Pro on major visual-perception benchmarks.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
CnEVPost[1][3][4][5], 23 September 2025: Shangjie 'officially launched its first model, the H5 SUV' at 'a HIMA launch event today'.
Shangjie, HIMA's fifth brand, launched its first model, the H5 SUV, on 23 September 2025 from 159,800 yuan, the cheapest car in the Huawei alliance, with 160,000 pre-orders and 10,000 firm orders in the first hour.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins83% CONFIDENCEOverall confidence: 83%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
OpenAI's[1][2] own model release notes date this entry Sep 23, 2025
OpenAI makes GPT-5-Codex available to developers in the Responses API, beyond the Codex surfaces.
Los Angeles City Hall, 200 North Spring Street, Civic Center, Los Angeles, CA 90012Mayor of Los Angeles
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Mayor's release "Posted on 09/23/2025"; FOX 11 the same day: "Mayor Karen Bass signed an agreement Tuesday".[1]
Mayor Karen Bass signed agreements with SEIU 721, AFSCME and other unions that averted the last of the roughly 600 civil-service layoffs and the planned furloughs in the 2025-26 budget, closing the city's $1 billion deficit.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins87% CONFIDENCEOverall confidence: 87%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Review-Journal[1], 23 September 2025: the interchange project 'is substantially completed', with officials 'on hand Tuesday morning ... for a ribbon cutting ceremony celebrating the end of the multiyear road project'.
Nevada's governor and NDOT cut the ribbon on the $382 million rebuild of the Interstate 15 and Tropicana Avenue interchange, the south-Strip gateway to Allegiant Stadium and T-Mobile Arena, after three and a half years of 'Dropicana' closures.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins79% CONFIDENCEOverall confidence: 79%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Taiwan News[1] (24 Sep 2025): flooding from the Mataian River barrier lake carried away a car "on Tuesday"; 23 September 2025 was a Tuesday, and Wikipedia[2][3][4] describes the lake overflowing during Typhoon Ragasa.
On 23 September 2025 heavy rain from Super Typhoon Ragasa made the landslide-dammed Matai'an Creek barrier lake overflow, sweeping a wall of mud and water into Guangfu township in Hualien and killing at least 18 people.
Red Rocks Amphitheatre, 18300, West Alameda Parkway, Morrison, Jefferson County, Colorado, 80465, United StatesInterscope Records
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Billboard's[1] gallery, published 25 September 2025, says Rapp 'kicked off her Bite Me Tour this week at the vaunted Red Rocks Amphitheatre' and shows 'Tuesday's (Sept. 23) show', and Wikipedia's[2][3] tour page gives September 23, 2025 in Morrison; no show time is stated, so the day is all-day.
Reneé Rapp kicked off her Bite Me Tour at Red Rocks Amphitheatre on 23 September 2025, playing all 12 songs from the album plus 'Colorado', on a 32-date run that ended in Dublin in March 2026. Kalshi had her at about 4 cents to win the 2027 Best New Artist Grammy on 10 October 2026.