第一项始终是图钉的来源。总体可信度是各份资料对上方所用开始和结束时间支持程度的加权平均;资料每比最新的一份旧 180 天,权重减半。
Felbermayr's[3] own account of the job states the barge carrying the two autoclaves reached the Aschach an der Donau port on 27 November 2017, ahead of the final road transport to FACC.
Trade press coverage of FACC installing new large autoclaves at its Innviertel plants around the same period.[1]
Felbermayr's own news account of the November 2017 autoclave transport for FACC, with weights, dates and route.
有遗漏或错误吗?用你自己的话说明:能佐证此图钉的链接、不同的开始或结束日期及理由,或缺失、有误的信息。AI 会对照此图钉的来源进行核实,搜索更好的来源,并添加任何支持你说法的页面。图钉自身的来源仍然最重要。