2028-04-21 is the interconnection record’s requested in-service date, not a verified opening or commercial-operation day.
S1100 is a 200 MW battery storage interconnection request in Mississippi, AR. The grid operator lists its queue status as Active. The requested in-service date is 2028-04-21; this is a planning date.