CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins81% CONFIDENCEOverall confidence: 81%How well the pin's source and references back up its dates.Weighted average of how firmly 6 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Source[1][5] reports the show airs Friday, November 27 at 8:00 PM ET/PT on BET with a CBS simulcast.
BET revives the Soul Train Awards on Friday 27 November 2026 at 8 p.m. ET/PT from Chicago, with a first-ever CBS simulcast.
Parque Rizal, Ermita, Fifth District, Manila, Capital District, Metro Manila, 1000, PhilippinesSunrise Events
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Rock 'n' Roll Running Series lists Manila on 29 November 2026 and Philstar[2] (2 June 2026) announces the same date for the fifth edition.
The night run starts at Luneta Park on 29 November 2026 and passes the National Museum, Fort Santiago and Binondo before the Manila Bay strip, with marathon, half, 10K and 5K distances.
2100 Barton Springs Rd, Austin, TX 78746Zilker Park
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The Parks and Recreation page lists November 29 through January 1.[1]
The tall light-strand tree is lit at a ceremony and stays up through New Year's Day.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins75% CONFIDENCEOverall confidence: 75%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
OPEC's[1] press release of the 41st ministerial on 7 June 2026 states that the 42nd OPEC and non-OPEC Ministerial Meeting is scheduled for 29 November 2026; Bernama's[2] August preview repeats the date.
OPEC+ ministers meet on 29 November 2026 for the group's twice-yearly ministerial, its second since the UAE left, with production levels agreed through December 2026 and maximum-capacity assessments due to set 2027 baselines.
Lusail International Circuit, Al Khor Coastal Road, Lusail, Al-Daayen, QatarFormula 1
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins77% CONFIDENCEOverall confidence: 77%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Formula1.com[1]'s race page shows the race on 29 Nov at 16:00 in its time display, which matches the 19:00 Qatar start (16:00 UTC), and the Wikipedia[2] calendar lists round 22 on 29 November.
Round 22 of 23: the Qatar Grand Prix, a 57-lap night race at Lusail International Circuit, starts at 19:00 local time on Sunday 29 November 2026, the penultimate round before Abu Dhabi, with no sprint and the Paddock Club already sold out.
McCormick Place, East 23rd Street, Motor Row, Near South Side, Chicago, South Chicago Township, Cook County, Illinois, 60616, United StatesRadiological Society of North America
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The RSNA[1] site reads 'Annual Meeting: Nov. 29 - Dec. 3, 2026' and 'Technical Exhibits: Nov. 29 - Dec. 2, 2026'.
The annual meeting of the Radiological Society of North America runs five days, with technical exhibits open for four.
4Market impact 4/10NVIDIA's GTC DC (Nov 30-Dec 3) is framed around AI and US economic growth with DOE and FDA speakers; the page lists no announcements yet, so any move depends on keynote news for the AI-infrastructure trade.Affects: NVDA, AI infrastructure names
Ronald Reagan Building and International Trade Center, 1300 Pennsylvania Avenue Northwest, Washington, DC 20004, United StatesNVIDIA
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins82% CONFIDENCEOverall confidence: 82%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NVIDIA's[1][2][4] GTC Washington, D.C. page states "November 30–December 3, 2026" ("Keynote Dec. 1 | Workshops Nov. 30") and "Tuesday, December 1 | 2 p.m. ET" for the keynote; its FAQ repeats the schedule.
NVIDIA's GTC returns to Washington from 30 November to 3 December 2026, centred on the Ronald Reagan Building, with Jensen Huang's keynote on 1 December at 2 p.m. ET.
Shangcheng District, Hangzhou City, Zhejiang, China
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
DeepSeek has announced nothing. On Polymarket’s[1] ladder for DeepSeek’s next Pro model, traders price a 20% chance by October 31 and 40% by November 30, 2026, on over $24,000 in volume. The pin takes the November 30 window.
Polymarket
Polymarket traders price a 40% chance that DeepSeek will release its next Pro model by November 30, 2026, on over $24,000 in volume.
Royal Albert Hall, 4, Kensington Gore, Knightsbridge, City of Westminster, Greater London, England, SW7 2AP, United KingdomBritish Fashion Council
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The ceremony's own site states: "Taking place on Monday 30th November 2026 at the Royal Albert Hall, The Fashion Awards[1] champions the cultural power of fashion."
The British Fashion Council's Fashion Awards 2026 will take place Monday, November 30, 2026 at London's Royal Albert Hall, the ceremony's annual celebration of designers and fundraiser for the BFC Foundation, which backs emerging talent.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 19 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: observed November 19, 2026 morning Pacific, Yes bid/ask was 62-66% above US$87.99, 51-55% above US$89.99 and 41-43% above US$91.99, so the 50% crossing sat near US$90.5. The November 30 5 pm EST index-reading event had about 169,500 traded contracts across 30 thresholds, not verified dollar turnover. A US$89-92 50% crossing is supported; a precise modal interval is not.[1]
Kalshi
Kalshi
Kalshi's November Brent contract resolves to a one-minute closing price on November 30, 2026 at 5:00 PM EST. On the morning of November 19 Pacific the Yes bid/ask put the 50% crossing at about US$90.5 per barrel (51-55% above US$89.99, 41-43% above US$91.99, 30-32% above US$93.99), with about 169,500 traded contracts across 30 thresholds. October finalized at US$112.35.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
This is a "by when" ladder with monthly rungs, not a scheduled event. November 2026 is the month the market prices highest (10% by November 1 rising to 23% by December 1, a 13-point month against 9 for October and 3 for December), and a month-only date takes its last day. The market gives the crossing only 26% before 2027 at all.[1]
Kalshi
Kalshi
On 20 September 2026 Kalshi’s "when will Bitcoin cross $100k again" ladder gave the whole of 2026 only a 26% chance, and the single likeliest month was November: the book jumped from 10% by November 1 to 23% by December 1. With BTC near $80,800 that was a 24% move traders mostly did not expect this year.
San Francisco International Airport, 780 S Airport Blvd, San Francisco, CA 94128, United StatesCovenant Aviation Security
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins80% CONFIDENCEOverall confidence: 80%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Scheduled: AviationPros[1] (1 October 2026) and KRON4[2] both say the WARN notice sets the layoffs "effective Nov. 30" with VMD scheduled to assume operations December 1.
A California WARN notice lists 1,279 Covenant Aviation Security layoffs at San Francisco International Airport effective November 30, 2026, the day before VMD Corp. takes over TSA passenger and baggage screening under a new five-year contract; SFO says screening is not expected to be disrupted.
Googleplex, 1600 Amphitheatre Parkway, Mountain View, CA
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Google has announced nothing. On Polymarket’s[1] ladder for Google’s next general-purpose Gemini Flash model (version 3.9 or higher), the probability rises from 10.5% by October 15 and 33% by October 31 to 82.5% by November 30, 2026, putting 49.5 percentage points in November. The pin takes November 30, 2026, the resolution date of the majority probability bracket.
Polymarket
Polymarket traders price an 82.5% chance that Google will release its next Gemini Flash model (version 3.9 or higher) by November 30, 2026, with the largest single probability bracket falling across November after a 33% mark by October 31.
Googleplex, 1600 Amphitheatre Parkway, Mountain View, California 94043, United States
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Google has announced nothing. On Polymarket’s[1] ladder for Google’s next Gemini Flash-Lite model (version 3.6 or higher), the probability trades at 16% by October 31 and rises to 55.5% by November 30, 2026, putting the majority probability threshold at the end of November.
Polymarket
Polymarket traders price a 55.5% chance that Google will release its next Gemini Flash-Lite model (version 3.6 or higher) by November 30, 2026, up from 16% by October 31.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins75% CONFIDENCEOverall confidence: 75%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
WCPFC[1] meeting page, 23rd Regular Session of the Commission: 'Location: Port Vila, Vanuatu; Meeting Dates: Monday, November 30, 2026 - Saturday, December 5, 2026; Arrangements: Provisional'.
The Western and Central Pacific Fisheries Commission holds its 23rd annual session in Port Vila, Vanuatu, from 30 November to 5 December 2026, with a bigeye tuna management procedure and the 2027 IUU vessel list on the agenda.
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: On October 17, 2026, Polymarket[1] traders assigned 62.5% to an announcement by November 30, the first listed deadline above 50%, on US$229,217 reported event volume. This cumulative forecast dates the expected announcement approximately by that horizon; it predicts neither the exact day nor the later swearing-in or settlement time.
Polymarket
On October 17, Polymarket priced a replacement announcement by November 30 at 62.5%, versus 18.5% by October 31 and 82.5% by December 31, with US$229,217 traded. November 30 is an estimated timeline marker, not an official appointment date.
Mahan Court, FDA White Oak Campus, White Oak, Montgomery County, Maryland, 20993, United StatesRoche
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins78% CONFIDENCEOverall confidence: 78%How well the pin's source and references back up its dates.Weighted average of how firmly 4 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Roche's[1] release says "The FDA is expected to make a decision on the approval by 30 November 2026", the PDUFA goal date set under Priority Review.
The FDA is due to decide by 30 November 2026 whether to approve Roche's giredestrant, an oral SERD that cut the risk of recurrence or death by 30% versus standard hormone therapy in early ER-positive breast cancer.
Discord, 444 De Haro Street, San Francisco, CADiscord
ESTIMATEDDate confidence: ESTIMATEDA target, not a fixed dateHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all ESTIMATED pins65% CONFIDENCEOverall confidence: 65%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins from 50% to 74% confidence
Estimated: this is a listing-date market, which is separate from the earlier IPO announcement. Polymarket[1][2] resolves Yes only once shares are listed and open for trading, so no strike reaches 50%, so the date is the start of the largest step, November 30 (2.4%) to December 31 (6%). Prices read on 27 October 2026 from the exchange's public API; event volume US$17,614 is as reported by Polymarket.
Polymarket
On 27 October 2026 Polymarket put Discord shares listed and open for trading by November 30 at 2.4%, on US$17,614 of event volume. No strike reaches even odds yet, so the date marks the biggest jump in the ladder, not a confident call.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins84% CONFIDENCEOverall confidence: 84%How well the pin's source and references back up its dates.Weighted average of how firmly 5 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
OpenAI's[1][3][5] own deprecation page, announced 2026-06-02, gives the shutdown date as 1 December 2026. A shutdown date is the vendor's commitment to developers and is occasionally pushed back, never brought forward.
OpenAI removes gpt-image-1-mini, gpt-image-1.5 and chatgpt-image-latest from its API on 1 December 2026; its current deprecation table points callers to the gpt-image-2.5 models (sunburst or flare).
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins88% CONFIDENCEOverall confidence: 88%How well the pin's source and references back up its dates.Weighted average of how firmly 2 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The city page lists ice skating as the winter use of the Frog Pond; exact opening dates for 2026-27 were not posted.[1]
The city's public rink on Boston Common offers winter skating in the middle of downtown. The same pond is a spray pool in summer.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins76% CONFIDENCEOverall confidence: 76%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
The organiser's page gives "Ceremonia de premiación: Martes 1 de diciembre de 2026" and "Entrega de resultados: Martes 1 de diciembre de 2026".[1]
The 31st Catad'Or World Wine Awards, Latin America's largest wine competition by its own billing, holds blind tastings on 24-26 November and its ceremony on 1 December.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
NPS[1] says whale watching season is roughly end of December through mid-March.
Point Loma overlook for spotting migrating gray whales offshore.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Downtown Tempe[1] lists Dec 4-6, 2026 and March 12-14, 2027, two separate runs.
Twice-yearly art festival on Mill Avenue, cash free.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
Groundbreaking date from VHB's[1] report; December 2026 is the developer's expected commissioning, so the end date is a target.
Flatiron Energy's Taft battery is a 200 MW, 800 MWh storage project on an industrial parcel in Uxbridge, Massachusetts. It broke ground on October 23, 2025 with full commissioning expected by December 2026.
SCHEDULEDDate confidence: SCHEDULEDGiven as scheduledHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all SCHEDULED pins76% CONFIDENCEOverall confidence: 76%How well the pin's source and references back up its dates.Weighted average of how firmly 3 references, the source included, support the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
ODFW: 'Targeted to open Dec. 1, Oregon's ocean commercial Dungeness crab season can be delayed or partially opened so consumers get a high-quality product and crabs are not wasted.'[1]
Oregon's ocean commercial Dungeness crab season is targeted to open on 1 December 2026, subject to pre-season meat-fill and biotoxin tests and to opening in step with Washington and California.
CONFIRMEDDate confidence: CONFIRMEDStated as firmHow firmly the source words the date: confirmed, scheduled, estimated, delayed or unverified.Show all CONFIRMED pins85% CONFIDENCEOverall confidence: 85%How well the pin's source and references back up its dates.Weighted average of how firmly 1 reference, the source included, supports the pin's start and end times; a reference counts half as much for every 180 days older than the newestShow all pins at 75% confidence or better
LAist[1] says whale watching typically runs December through May, peaking January to March.
Clifftop overlook where gray whales can be spotted on their migration along the coast, with a small museum on site. Boat cruises also leave from nearby harbors.