Estimated: North of Hollister airport, San Benito County, California; approximate Allium proposal context from operator Bolsa / SR156 / San Felipe aerial map, not a surveyed parcel centroidLongroad Energy
Estimated: Switchgrass Industrial Park near U.S. 85, about 8 miles south of Cheyenne, Laramie County, Wyoming (approximate: pin set at Cheyenne city centre; no street address published)Google
Cowboy State Daily[1](2026年7月8日):“计划2031年竣工”;Cleanview[3]列出2029年的2号楼(464 MW)、2030年的3号楼(464 MW)和2031年的4号楼(678 MW)。
Google通过其子公司Jupiter Star Holdings推进Project Tembo(原Project Jade),这是位于怀俄明州夏延以南Switchgrass Industrial Park 716英亩土地上的2.7 GW(2,700 MW)数据中心园区,计划2031年竣工;成本尚未公布。